1
/
of
6
RDX Sports Belgium - Part of NRG fitness BV
RDX 4 Inch Leather Weightlifting Gym Belt
RDX 4 Inch Leather Weightlifting Gym Belt
SKU:WBS-4RB-S
Regular price
€46,90 EUR
Regular price
Sale price
€46,90 EUR
Unit price
/
per
Tax included.
Shipping calculated at checkout.
Low stock: 1 left
Couldn't load pickup availability
Feel the power with this wide weight-lifting back-supporting belt, made from authentic suede cowhide leather for a robust design that will last. The carbon fiber padding perfectly dampens your back, the wide coverage ensures that you get both belly and back support when you need it, the expertly designed lining will remove sweat to keep you nice and dry, while the hard nails buckle give you a secure fit when you lift or stack. This belt is solid enough to perform under any pressure, but never detracts from comfort.
RDX Gym Leather Weightlifting Belt
- Made with authentic suede leather for durability and resilience
- Special carbon fiber filling for improved support and stress reduction
- 10 cm wide power belt for perfect coverage of the back and abdomen during your workout
- QD-1 ™ lining with moisture management to keep you dry and healthy
- Double-toothed roller buckle with advanced double stitching for a secure fit
Available in 5 different sizes, look at the images for the size chart.
Share
